AI summaryOriginal reporting byStoreys
    Read at source
    Toronto·Development·

    From Muck To Material: The Second Life Of Transit Tunnels

    • Metrolinx began tunneling the 15.6-kilometre Ontario Line using two tunnel boring machines between Exhibition Station and the Don Yard.
    • Machines will dig as deep as 40 metres, extracting varying materials including sand, clay, silt, and bedrock.
    • Excavated material is being diverted from landfills through processing and reuse systems rather than traditional disposal.
    • Secondary tunneling phases are planned below Pape Avenue to connect Gerrard Station to the DVP.
    Why it matters · our take

    Efficient management of excavation waste and the expansion of the Ontario Line are critical for reducing logistical costs and unlocking high-density residential development potential along the new transit corridor.

    This is a short AI-generated summary. For the complete reporting, photos, and full context, please read the original article at the publisher.

    Read full article at Storeys
    Back to all news

    Related Stories